for pulic for researcher English
General Introduction
TOP Access For Visiters Map Library sitemap search
>Top >General Introduction >History
last update: 10/01/26   

  History
 
1954   Formation of a working group for the foundation of an institute for nuclear study.
1955   The Institute of Nuclear Study (INS) was established.
1957 Sep FF cyclotron was completed.
1958 May
Jun
FM cyclotron was completed.
The first experiment with the FF cyclotron started.
1960 Oct The first experiment with the FM cyclotron started.
1961 Dec An Electron Synchrotron (ES) succeeded in accelerating an electron beam up to 750 MeV.
1963 Apr The first experiment with the ES started.
1964 Apr Formation of a working group for the foundation of a new research institute for elementary particle physics.
1966 Mar The ES achieved a 1.3 GeV beam.
1971     Apr National Laboratory for High Energy Physics (KEK) was established.
1976     Mar A proton synchrotron (PS) produced an 8 GeV beam as designed.
  Dec     The PS achieved 12 GeV.
1977 May     The first PS experiment started.
    Experiments with the SF cyclotron started. Dec  
1978   Meson Science Facility was established.   A Booster Synchrotron Utilization Facility and a Photon Factory (PF) were founded.
1980     Jul Experiments with Booster Synchrotron Utilization Facility started.
1982     Mar The PF succeeded in storing a 2.5 GeV electron beam.
1983     Jun PF Experiments started.
1984     Jul The TRISTAN Accumulator Ring (AR) accelerated an electron beams up to 6.5 GeV.
1985     Oct The AR accelerated a positron beam up to 5 GeV.
1986     Nov The TRISTAN Main Ring (MR) succeeded in accelerating both electron and positron beam to 25.5 GeV.
1987     May TRISTAN experiments started.
1988   Meson Science Facility was reorganized as Laboratory(MSL) Nov The MR energy was upgraded to 30 GeV with the help of superconducting accelerating cavities.
1989 Sep First electron cooling by TARNII   Accelerator and Synchrotron Radiation Science departments were established in the Graduate University for Advanced Studies
1993 Mar Isotope Separator On-Line (ISOL) was completed.    
1994     Jun The KEKB B-factory construction started.
1995     Dec TRISTAN experiments finished.
1997   High Energy Accelerator Research Organization was established.
1998   First beam storage at KEKB (KEK B-factory) ring
1999 Apr Department of Particle and Nuclear Science was founded in the Graduate University for Advanced Studies
  May Long-baseline Neutrino Oscillation experiment (K2K) started
  Jun Belle experiment at KEK B-factory began the operation
2000   Tanashi Branch closed
2001   Construction of High Intensity Proton Accelerators (J-PARC) started
2004 Apr

Nov
Became the Inter-University Research Institute Corporation High Energy Accelerator Research Organization.
K2K experiment ended
2005 Apr
Dec
Tokai Campus was opened.
Experiments at PS ended.
2006 Feb
Mar
J-PARC Center was established.
Experiments at BSF ended.
2007 Jan
Oct
181MeV proton beam at J-PARC Linac.
3 Gev proton beam at J-PARC Rapid Cycling Synchrotron (RCS).
2008 Oct Prof. Makoto Kobayashi, former director of IPNS  won the 2008 Nobel Prize in Physics.
2009 Mar J-PARC construction was completed.

copyright(c) 2004-2009, HIGH ENERGY ACCELERATOR RESEARCH ORGANIZATION, KEK
1-1 Oho, Tsukuba, Ibaraki 305-0801 Japan
www-admin@kek.jp | Copyright | Send Question |